LANBI has recently delivered 2 Automatic Palletized Lines for Ball Joint Assembly and Control for a leading Northamerican multinational company in the field.

ball joint assembly lines case study

Along 15 stations the ball joint is assembled, thermal calibrated and controlled, storing all the resulting data related to each part in a PC. Finally the part is automatically palletized in boxes. By means of 6 robots, the lines are producing each 10 seconds one Front Lower Suspension Ball Joint and one Front Upper suspension Ball Joint.

Related Posts